Periodic surveys by Classification Societies in maintaining cargo ships standard

Requirement of Periodic surveys
To maintain the assigned class all steel ships are required to be surveyed and examined by the Society’s surveyors at regular periods. The major hull items to be examined at these surveys only are discussed here.


Annual Surveys

Annual surveys are applicable for all steel ships. These annual surveys are where practicable held concurrently with statutory annual or other load line surveys. At the survey the surveyor is to examine the condition of all closing appliances covered by the conditions of assignment of minimum freeboard, the freeboard marks, and auxiliary steering gear particularly rod and chain gear. Watertight doors and other penetrations of watertight bulkheads are also examined and the structural fire protection verified. The general condition of the vessel is assessed, and anchors and cables are inspected where possible at these annual surveys. Dry bulk cargo ships are subject to an inspection of a forward and after cargo hold.




Intermediate Surveys

Instead of the second or third annual survey after building or special survey an intermediate survey is undertaken. In addition to the requirements for annual survey particular attention is paid to cargo holds in vessels over 15 years of age and the operating systems of tankers, chemical carriers and liquefied gas carriers.


Docking Surveys

Ships are to be examined in dry dock at intervals not exceeding 2˝ years. At the drydocking survey particular attention is paid to the shell plating, stern frame and rudder, external and through hull fittings, and all parts of the hull particularly liable to corrosion and chafing, and any unfairness of bottom.


In-Water Surveys

In water survey (IWS) – The survey of hull plating undertaken in the water. The ship is provided with marks placed on the shell to show borders of tanks, cofferdam etc. Hull plating should be cleaned by a diver-operated machine. A remotely-operated underwater TV camera is used to view the ship plating.

IWS can be also applied for checking that the seal assembly on oil lubricated stern tube bearings is intact and for verifying the clearance or wear-down of the stern bearing. For that, an opening in the top of the seal housing and a suitable gauge should be provided for checking the clearance by the divers.

The Society may accept in-water surveys in lieu of any one of the two dockings required in a five-year period. The in-water survey is to provide the information normally obtained for the docking survey. Generally consideration is only given to an in-water survey where a suitable high resistance paint has been applied to the underwater hull.


Special Surveys

Steel ships may be subject to special surveys as required by various classification society rules. These surveys become due at five yearly intervals, the first five years from the date of build or date of special survey for classification and thereafter five years from the date of the previous special survey. Special surveys may be carried out over an extended period commencing not before the fourth anniversary after building or previous special survey, but must be completed by the fifth anniversary.

The hull requirements at a special survey, the details of the compartments to be opened up, and the material to be inspected at any special survey are listed in detail in the Rules and Regulations . Special survey hull requirements are divided into four ship age groups as follows:

1. Special survey of ships—five years old
2. Special survey of ships—ten years old
3. Special survey of ships—fifteen years old
4. Special survey of ships—twenty years old and at every special survey thereafter.

In each case the amount of inspection required increases and more material is removed so that the condition of the bare steel may be assessed. It should be noted that where the surveyor is allowed to ascertain by drilling or other approved means the thickness of material, non-destructive methods such as ultrasonics are available in contemporary practice for this purpose. Additional special survey requirements are prescribed for oil tankers, dry bulk carriers, chemical carriers and liquefied gas carriers.

When classification is required for a ship not built under the supervision of the Society’s surveyors, plans showing the main scantlings and arrangements of the actual ship are submitted to the Society for approval. Also supplied are particulars of the manufacture and testing of the materials of construction, together with full details of the equipment. Where plans, etc., are not available, the Society’s surveyors are to be allowed to lift the relevant information from the ship. At the special survey for classification all the hull requirements for special surveys (1), (2), and (3) are to be carried out.

Ships over twenty years old are also to comply with the hull requirements of special survey (4), and oil tankers must comply with the additional requirements stipulated in the Rules and Regulations. During this survey the surveyor assesses the standard of the workmanship, and verifies the scantlings and arrangements submitted for approval. It should be noted that the special survey for classification will receive special consideration from Lloyd’s Register in the case of a vessel transferred from another recognized Classification Society. Periodical surveys where the vessel is classed are subsequently held as in the case of ships built under survey, being dated from the date of special survey for classification.


Damage Repairs

When a vessel requires repairs to damaged equipment or to the hull it is necessary for the work to be carried out to the satisfaction of Lloyd’s Register surveyors. In order that the ship maintains its class, approval of the repairs undertaken must be obtained from the surveyors either at the time of the repair or at the earliest opportunity.


Survey requirement

Survey on board cargo ships Can be divided into a few major group

a) Statutory survey

b) Class survey

c) Other survey

Statutory survey:-

i) Load line survey (5 years)

ii) Safety Construction (5 years)

iii) IOPP (5 years)

iv) Safety Equipment (2 years)

v) Safety Radio Telegraphy (1 year)



Class survey:-

# Special hull survey

# Special machinery survey

# Annual survey for hull & machinery

# Intermediate survey, hull

# Bottom

# Tail shaft

# Auxiliary boiler, oil fired

# Auxiliary boiler, exhaust



Other survey

#Cargo gear survey

#Admin. survey





More on general cargo ship :
  1. Rope handling safe procedure

  2. Ropes are made of short fibres that are spun into yarns, which are then made into flat or twisted strands. And the strands are spun or braided to make the finished rope .
    More .....

  3. Synthetic man-made ropes and hawsers

  4. Although natural fibre ropes are still widely used throughout the marine industry, they have been superseded by synthetic fibres for a great many purposes. Not only do the majority of synthetic ropes have greater strength than their natural fibre counterparts, but they are more easily obtainable and at present considerably cheaper.
    More .....

  5. Natural fibre rope

  6. All natural fibre rope is manufactured from manilla, sisal, hemp, coir, cotton or flax fibres.The process of manufacture consists of twisting the fibres into yarns and turning the yarns in an opposite direction to establish the strands.
    More .....

  7. Lay of Ropes and hawsers - Small Stuff descriptions

  8. The lay of rope is a term used to describe the nature of the twist that produces the complete rope .The most common form of rope at sea is known as ‘hawser laid rope’ comprising three strands laid up right- or lefthanded.
    More .....

  9. Stresses in ship structures and how to mitigate

  10. Heavy weights tend to cause a downward deflection of the deck area supporting the load .This subsequently produces stresses, with consequent inward and outward deflections of supporting bulkheads, depending on the position of initial loading .
    More .....

  11. Anchoring safe practice

  12. Prior approaching an area for anchoring ships master should investigate fully a suitable anchoring position and conduct a planned approach including speed reduction in ample time and orienting the ships head prior anchoring to same as similar sized vessels around or stem the tide or wind whichever is stronger . Final decision to be made on method of anchoring to be used , the number of shackles , the depth of water, expected weather and holding ground. .
    More .....

  13. MacGregor single-pull weather-deck hatch cover

  14. Hatch covers are used to close off the hatch opening and make it watertight. Wooden hatch covers, consisting of beams and boards over the opening and covered with tarpaulins, were once used but are no longer fitted. Steel hatch covers, comprising a number of linked steel covers, are now fitted universally. Various designs exist for particular applications, but most offer simple and quick opening and closing, which speed up the cargo handling operation..
    More .....

  15. Cargo holds access arrangement

  16. The access shall be separate from the hatchway opening, and shall be by a stairway if possible. A fixed ladder, or a line of fixed rungs, shall have no point where they fill a reverse slope .
    More .....

  17. Prepare cargo holds prior loading

  18. Washing is always carried out after the compartment has been swept. Drying time for washed compartments must be allowed for, before loading the next cargo; this time will vary with the climate, but two to three days must be expected.
    More .....

  19. Strength and stability of the Lifting appliances

  20. The vessel's structure, crane, derrick or other lifting device and the supporting structure should be of sufficient strength to withstand the loads that will be imposed when operating at its maximum load moment .
    More .....

  21. Lifting appliances - Maintenance, testing, controls & safety measures

  22. When there is any suspicion that any appliance or item of equipment may have been subjected to excessive loads, exceeding the Safe Working Load (SWL), or subjected to treatment likely to cause damage, it should be taken out of service until it can be subjected to a thorough examination by a competent person.
    More .....

  23. Safe operation of Lifting appliances and gears

  24. All lifting operations must be properly planned, appropriately supervised and carried out to protect the safety of workers.
    More .....

  25. Derricks for lifting cargo on board

  26. Derricks for lifting cargo on board is required to be of adequate strength and stability for each load, having regard in particular to the stress induced at its mounting or fixing points , securely anchored, adequately ballasted or counterbalanced and supported by outriggers as necessary to ensure its stability when lifting.
    More .....

  27. Deck cranes

  28. Deck cranes have a number of advantages, the rigging time being negligible, and the crane is able to pick up and land permitted loads anywhere within its working radius. The safe working loads of cranes is generally of the order of 10 to 15 tonnes and larger cranes are available capable of lifts from 30 to 40 tonnes..
    More .....

  29. Characteristics of Marine paints

  30. Paint consists of pigment dispersed in a liquid referred to as the ‘vehicle’. When spread out thinly the vehicle changes in time to an adherent dry film. The drying may take place through one of the following processes..
    More .....

  31. Protection by Means of Paints

  32. It is often assumed that all paint coatings prevent attack on the metal covered simply by excluding the corrosive agency, whether air or water. This is often the main and sometimes the only form of protection; however there are many paints which afford protection even though they present a porous surface or contain various discontinuities. .
    More .....

  33. Role classification societies maintaining seaworthiness of vessels

  34. classification societies publish rules and regulations which are principally concerned with the strength of the ship, the provision of adequate equipment, and the reliability of the machinery .
    More .....

  35. Periodic survey requirement by classification societies

  36. To maintain the assigned class all steel ships are required to be surveyed and examined by the Society’s surveyors at regular periods. The major hull items to be examined at these surveys only are discussed here..
    More .....

Machinery system main info pages

Home page||Cooling ||Machinery||Services ||Valves ||Pumps ||Auxiliary Power ||Propeller shaft ||Steering gears ||Ship stabilizers||Refrigeration||Air conditioning ||Deck machinery||Fire protection||Ship employment ||


Home ||




General Cargo Ship.com provide information on cargo ships various machinery systems -handling procedures, on board safety measures and some basic knowledge of cargo ships that might be useful for people working on board and those who working in the terminal. For any remarks please Contact us


Copyright © 2010-2016 General Cargo Ship.com All rights reserved.
Terms and conditions of use
Read our privacy policy|| Home page||